To give you a quote, we need to see the place first, either by recording a short video showing the main DB up to the desired charging point in the garage or by scheduling a free site visit.
You may apply for a charger installation service without needing a site visit. All you have to do is fill out the request form and upload the video. We will review your application and send you a quote within 1 working day.
If you would like a free site visit, select “Free Site Visit” in the form. We will contact you to schedule the visit. (Note: Free site visit may take 5 working days depending on demand and address location).
Apply here:
Yes. Our firm is one of the approved Tesla charger installers. You may verify at Tesla website:
https://www.tesla.com/en_AE/support/find-electricianWe are using 4-core armored cable size 10mm along with earth cable size 6mm, brands like RR or DUCAB, all fitted inside PVC insulation.
We use residual circuit breaker RCB 40A along with waterproof isolator 40A, brand ABB or GEWISS.It depends on the cabling distance. If the cabling is laid on the wall, it will take between 1 to 3 working hours. If the cabling is laid underground with civil works, it may take between 3 to 4 working hours. The job can be completed on the same day.
You can pay in advance, during the work, or after the work is completed within the same day.
You can pay using a credit/debit card, cash, or online bank transfer.
https://shop.tesla.com/en_ae/product/wall-connector
The charger has IP44 rating dust and water proof. It can withstand temperatures up to 50C. However, it is recommended to place the charger under sun shade. Direct sunlight during the summer season may affect the charger.
We can provide a safety enclosure for the charger to protect it from direct sunlight. It can also be locked to protect the charger from vandalism. The enclosure option is available in our store. Please visit our online store to view the details.
Porsche Taycan does include a Porsche mobile charger that comes with the car. It can be used as a 3-phase fast charger, or in any domestic socket 220V by changing its adapter.
We can provide the installation of the Porsche mobile charger. However, If you would like to have a stationary charger at home while keeping the Porsche mobile charger for emergency use outside, you may buy one of our products in our online store.
Yes, you may buy the chargers from our online store and ship them anywhere within the UAE, or you may pass by our shop in Dubai.
Charging speed depends on 3 things:
1. Charger power in kW
2. EV model and its maximum capability
3. EV battery size in kWh
Chargers come in various powers like 3kW, 7kW, 11kW or 22kW. On the other hand, every EV has its own capability in receiving the power. Some EVs cannot accept more than 7kW regardless of how much the charger can produce, and some EVs can accept 11kW or even 22kW. These limits are set by the EV manufacturer and cannot be changed.
For example, an EV has a battery size of 80kWh, capable of receiving 7kW max, and connected to a 22kW charger, then the charging speed will be 7kW only. We simply divide the battery size by the charging speed, and we get the number of hours to fully charge the battery:
80 ÷ 7 = 11.5 hoursYes. Tesla or Porsche chargers may charge any other car and vice versa, as long as the charging port is the same type (Type 2).
US Spec Tesla has a different charging port. Therefore, Tesla chargers of our region will not fit the US imported Tesla, and there are no adapters to convert a US Tesla to Type2.
Installing a charger in a building is possible in very few cases, but it is conditional. Conditions differ from one building to another. First thing is to get permission and approval from building management.
Yes. It is possible to relocate the charger to another place. In fact, moving a charger to a new place requires more time and effort than a new installation. The cost depends on the following scenarios:
1. Remove the charger only, keep the old cabling as it is, and make new cabling in the new place; Cost will be similar to new standard installation charges.
2. Remove the charger along with old cabling, and the new place requires less cabling distance; Cost will be 1000 AED + any additional civil works + VAT.
3. The new place requires longer cabling than the old place; We cannot re-use the old cabling. Therefore the cost will be similar to new standard installation charges.
The old cabling is done underground; We cannot re-use the old cabling. Therefore the cost will be similar to new standard installation charges.The first step is to install the charger, then apply for ADDC meter. To apply for ADDC meter, click here:
https://myapp.addc.ae/EVSERegistration/
To answer all related questions regarding ADDC regulations about EV charging, click here:
https://www.addc.ae/en-us/residential/_layouts/15/addc/faq.aspx?c=26